accuris store logo
  • Browse all
  • 3A
  • 9000
  • A3
  • A4A
  • AA
  • AAMI
  • AASHTO
  • AATCC
  • ABCB
  • ABMA
  • ABMA-BOILER
  • ACC
  • ACGIH
  • ACI
  • ADA
  • ADS
  • AEIC
  • AENOR
  • AES
  • AFCEN
  • AGA
  • AGMA
  • AHAM
  • AHP
  • AHRI
  • AIA
  • AIAA
  • AICHE
  • AIHA
  • AIIM
  • AISC
  • ALI
  • ALPEMA
  • AMCA
  • ANS
  • ANSI
  • ANSI/ANSLG
  • ANSI/NEMA
  • ANSI/TCNA
  • ANSI/UAMA
  • API
  • APWA
  • AREMA
  • ARINC
  • ARMY
  • AS
  • ASA
  • ASABE
  • ASCE
  • ASD-STAN prEN
  • ASHE
  • ASHRAE
  • ASIS
  • ASM
  • ASME
  • ASNT
  • ASQ
  • ASSE (Plumbing)
  • ASSP
  • ASTM
  • ATIS
  • AVIXA
  • AWC
  • AWI
  • AWPA
  • AWS
  • AWWA
  • B11
  • BHMA
  • BICSI
  • BIFMA
  • BioWorld
  • BMI
  • BS
  • CAN/CGSB
  • CAN/ULC
  • CEI
  • CFR
  • CGA
  • CGSB
  • CIE
  • CII
  • CISPR
  • CLSI
  • CMAA
  • CRANE
  • CRSI
  • CSA
  • CTA
  • CTI
  • DID
  • DIN
  • DNV
  • DOD
  • DOXPUB
  • DVS
  • ECIA
  • EEC
  • EEMUA
  • ESD
  • ETSI
  • FCI
  • FED
  • FM Approvals
  • FORD
  • FRPI
  • GMW
  • GPA
  • HEI
  • HFES
  • HI
  • HIR
  • HPS
  • I3A
  • IADC
  • IAPMO
  • IATA
  • ICAO
  • ICC
  • ICEA
  • ICML
  • IEC
  • IEEE
  • IEEE/UL
  • IES
  • IEST
  • IFI
  • IICRC
  • INCITS
  • INTERN
  • IPC
  • ISA
  • ISEA
  • ISO
  • ISO/IEC/IEEE
  • ISPE
  • ISTA
  • ISUZU
  • JEDEC
  • JIS
  • LIA
  • MBMA
  • MCGRAW-HILL
  • MIL
  • MPIF
  • MSS
  • NAAMM
  • NACE
  • NADCA
  • NAS
  • NASA
  • NBBI
  • NCSL
  • NECA
  • NEMA
  • NETA
  • NFPA (Fire)
  • NFPA (Fluid)
  • NFSI
  • NG
  • NGA
  • NISO
  • NORSOK
  • NRC
  • NSC
  • NSF
  • NZS
  • OPEI
  • PCI
  • PDA
  • PEI
  • PIA
  • PIP
  • PPI
  • RTCA
  • SAE
  • SAIA
  • SCTE
  • SDI
  • SES
  • SIA
  • SJI
  • SMACNA
  • SME
  • SMPTE
  • SN EN
  • SPC
  • SPI
  • SSPC
  • STI/SPFA
  • TAPPI
  • TCIA
  • TEMA
  • THHILL
  • TIA
  • TMS
  • UL
  • ULC
  • UOP
  • WILEY
  • WRC
  • X9
Publishers
Need Help?
Log in
Create Account
Cart

Your shopping cart is empty.

Log in or create account

  1. Home
  2. ASTM E1368-02

ASTM E1368-02 Historical

1040032

Standard Practice for Visual Inspection of Asbestos Abatement Projects

standard by ASTM International , 07/10/2002

This document has been replaced. View the most recent version.
This standard is not available for sale.

Track This

Full Description

1.1 This practice covers procedures for performing visual inspections of asbestos response actions to:

1.1.1 Establish the extent of the required work before it begins;

1.1.2 Determine the progress and quality of the work and evaluate the completeness of the response action; and

1.1.3 Evaluate the cleanliness of the work area prior to final air testing for clearance (if performed), and subsequent to dismantling of critical barriers.

1.2 This practice can be used on an abatement project, or for operations and maintenance (OM) work, performed by the building owner's staff. It can also be used in conjunction with contract documents between the building owner and other parties involved in an abatement project.

Note 1 - Standard contract documents (such as AIA and EJCDC documents) define contractual relationships and responsibilities for projects within the construction industry. Asbestos abatement projects differ from traditional construction projects in the manner of their design and execution, as well as in the type and level of oversight required to substantiate their successful completion. Non-traditional responsibilities are given to the building owner, project designer, and abatement contractor by this practice. Furthermore, responsibilities related to project oversight, inspections, and approvals are placed upon an additional non-traditional representative of the building owner; the project inspector, as defined by this practice. All parties are cautioned that the subject authorities and corresponding responsibilities be understood, mutually agreed upon, and correspondingly addressed with appropriate modifications, if necessary, to the contract documents for a specific project.

1.3 This practice provides the following information:

1.3.1 The objectives of the visual inspection process;

1.3.2 The responsibilities and qualifications of the individuals involved in the visual inspections;

1.3.3 The schedule of visual inspection activities during an abatement project and OM work;

1.3.4 The inspection procedures for the various types of abatement work and OM tasks; and

1.3.5 The criteria for certifying work as complete on the basis of the visual inspections.

1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. For specific safety statements, see 12.2.

See more

Also Bought By Customers

 

Document History

  1. ASTM E1368-23

    May 2023
    Standard Practice for Visual Inspection of Asbestos Abatement Projects

    • Most Recent  Most Recent
  2. ASTM E1368-14

    January 2014
    Standard Practice for Visual Inspection of Asbestos Abatement Projects

    • Historical Version
  3. ASTM E1368-11

    October 2011
    Standard Practice for Visual Inspection of Asbestos Abatement Projects

    • Historical Version
  4. ASTM E1368-05e1

    May 2005
    Standard Practice for Visual Inspection of Asbestos Abatement Projects

    • Historical Version
  5. ASTM E1368-05

    May 2005
    Standard Practice for Visual Inspection of Asbestos Abatement Projects

    • Historical Version
  6. ASTM E1368-03

    October 2003
    Standard Practice for Visual Inspection of Asbestos Abatement Projects

    • Historical Version
  7. ASTM E1368-02

    You are currently viewing this product 👀 currently
    viewing

    July 2002
    Standard Practice for Visual Inspection of Asbestos Abatement Projects

    • Historical Version

Browse related products from ASTM International

  • ASTM International > By Sections and Volumes > Section 4 - Construction > Volume 04.11: Building Constructions (I): E72 – E2166
  • ASTM International > By Sections and Volumes > Section 11 - Water and Environmental Technology > Volume 11.07: Air Quality
  • ASTM International > By ICS Code > 13: Environment. Health Protection. Safety > 13.030: Wastes > 13.030.30: Special Wastes

Order Options

Unavailable

Product Details

Published:

07/10/2002

Number of Pages:

12
✕

Document Delivery Options

✕

What is a Secured PDF?

Secured PDFs are equipped with Digital Rights Management (DRM) software, by request of the Publisher to protect the copyright of the Publication, preventing unauthorized duplication and distribution.

What does this mean?

To view the PDF, a DRM tool, FileOpen must be installed. FileOpen is a free plugin which is compatible with Adobe Acrobat Reader DC and Pro DC, as well as other PDF Readers noted on the FileOpen website.

What can you do with a Secured PDF?

  • Print (except for IADC, ICML)
  • Search
  • Highlight
  • Bookmark

Restrictions:

  • Some Publishers do not allow printing.
  • Most Publishers do not permit copy and pasting from the PDF.
  • Sharing, Duplicating and Distribution prohibited.
  • For further information on restrictions, please click here.

PRODUCTS & SERVICES

  1. BPVC 2025
  2. BPVC Previous Editions
  3. Engineering Workbench
  4. Track It

CUSTOMER CARE

  1. Help Center
  2. Glossary
  3. Search Tips

CONNECT WITH US

  1. Contact Us

COMPANY INFORMATION

  1. About Accuris
  2. Press
  • © Copyright 2026 ACCURIS
  • Privacy Policy
  • System Information
Device/OS: Unknown
Browser: Unknown Browser 0.0
User Agent: Mozilla/5.0 AppleWebKit/537.36 (KHTML, like Gecko; compatible; ClaudeBot/1.0; +claudebot@anthropic.com)
Store Name: css
Page: /standards/astm-e1368-02?product_id=1040032
Referrer: Direct Navigation
IP: 216.73.216.127
Language: en
Customer #: Not Logged In
Member?: NO
Cart #: 1463746437
Order #: None
Cookies: NO
×