accuris store logo
  • Browse all
  • 3A
  • 9000
  • A3
  • A4A
  • AA
  • AAMI
  • AASHTO
  • AATCC
  • ABCB
  • ABMA
  • ABMA-BOILER
  • ACC
  • ACGIH
  • ACI
  • ADA
  • ADS
  • AEIC
  • AENOR
  • AES
  • AFCEN
  • AGA
  • AGMA
  • AHAM
  • AHP
  • AHRI
  • AIA
  • AIAA
  • AICHE
  • AIHA
  • AIIM
  • AISC
  • ALI
  • ALPEMA
  • AMCA
  • ANS
  • ANSI
  • ANSI/ANSLG
  • ANSI/NEMA
  • ANSI/TCNA
  • ANSI/UAMA
  • API
  • APWA
  • AREMA
  • ARINC
  • ARMY
  • AS
  • ASA
  • ASABE
  • ASCE
  • ASD-STAN prEN
  • ASHE
  • ASHRAE
  • ASIS
  • ASM
  • ASME
  • ASNT
  • ASQ
  • ASSE (Plumbing)
  • ASSP
  • ASTM
  • ATIS
  • AVIXA
  • AWC
  • AWI
  • AWPA
  • AWS
  • AWWA
  • B11
  • BHMA
  • BICSI
  • BIFMA
  • BioWorld
  • BMI
  • BS
  • CAN/CGSB
  • CAN/ULC
  • CEI
  • CFR
  • CGA
  • CGSB
  • CIE
  • CII
  • CISPR
  • CLSI
  • CMAA
  • CRANE
  • CRSI
  • CSA
  • CTA
  • CTI
  • DID
  • DIN
  • DNV
  • DOD
  • DOXPUB
  • DVS
  • ECIA
  • EEC
  • EEMUA
  • ESD
  • ETSI
  • FCI
  • FED
  • FM Approvals
  • FORD
  • FRPI
  • GMW
  • GPA
  • HEI
  • HFES
  • HI
  • HIR
  • HPS
  • I3A
  • IADC
  • IAPMO
  • IATA
  • ICAO
  • ICC
  • ICEA
  • ICML
  • IEC
  • IEEE
  • IEEE/UL
  • IES
  • IEST
  • IFI
  • IICRC
  • INCITS
  • INTERN
  • IPC
  • ISA
  • ISEA
  • ISO
  • ISO/IEC/IEEE
  • ISPE
  • ISTA
  • ISUZU
  • JEDEC
  • JIS
  • LIA
  • MBMA
  • MCGRAW-HILL
  • MIL
  • MPIF
  • MSS
  • NAAMM
  • NACE
  • NADCA
  • NAS
  • NASA
  • NBBI
  • NCSL
  • NECA
  • NEMA
  • NETA
  • NFPA (Fire)
  • NFPA (Fluid)
  • NFSI
  • NG
  • NGA
  • NISO
  • NORSOK
  • NRC
  • NSC
  • NSF
  • NZS
  • OPEI
  • PCI
  • PDA
  • PEI
  • PIA
  • PIP
  • PPI
  • RTCA
  • SAE
  • SAIA
  • SCTE
  • SDI
  • SES
  • SIA
  • SJI
  • SMACNA
  • SME
  • SMPTE
  • SN EN
  • SPC
  • SPI
  • SSPC
  • STI/SPFA
  • TAPPI
  • TCIA
  • TEMA
  • THHILL
  • TIA
  • TMS
  • UL
  • ULC
  • UOP
  • WILEY
  • WRC
  • X9
Publishers
Need Help?
Log in
Create Account
Cart

Your shopping cart is empty.

Log in or create account

  1. Home
  2. NG UKBP/TP 106

NG UKBP/TP 106 ✓ Most Recent [ Revised ]

2783287

UK Business Procedure/Transmission Procedures - Equipment Commissioning & Decommissioning - Issue 12

standard by National Grid , 04/01/2016

Track This
✕

Document Set

This document is a set or collection of related documents
✕

Complete Document

The standards and other regulatory documents that Accuris offers are often updated after publication. These updates include errata (known issues to be addressed in the next version), corrigenda (errors or mistakes identified after publication), or amendments (additional information not included in the original document).

When you purchase a document from the Accuris store, you may select whether to buy only the base document or a complete document package that includes all errata, corrigenda, and amendments available for that document at the time of purchase. It does not grant access to errata, corrigenda, or amendments that may be published after the purchase date.
✕

Multi-User PDF

A Multi-User PDF allows you to purchase a finite set of single user licenses for a specific document. The number of user licenses available for purchase varies by document, please see the store listing for more specific information.
✕

Redline

When you purchase a Redline edition of a standard, you will get the current edition of that standard, plus the Redline version, which will show changes between the new edition and the previous edition.
✕

Member Price

Member pricing is available for this product.

Full Description

PURPOSE AND SCOPE

Application

a) This procedure defines National Grid requirements for the commissioning, decommissioning and recommissioning of all Equipment covered by the Electricity Transmission Licence including both overhead lines and cables, and auxiliary equipment. It also defines the commissioning / decommissioning / recommissioning requirements of unlicensed Equipment when undertaken by National Grid. Appendix S provides an overview of the licensed process.

b) The procedure is formatted on the basis that the Equipment to be commissioned / decommissioned / recommissioned forms part of a capital investment delivered by Construction and ETAM Operations.

c) The procedure therefore defines both the National Grid and Contractor tasks and responsibilities. When commissioning / decommissioning / recommissioning takes place under other circumstances (eg. following equipment fault and replacement), then the responsible managers must adhere to the principles of this document.

d) TP106 defines a framework of requirement which will apply to the majority of investments. Where it is evident that TP106 does not provide a fully satisfactory framework (e.g. for standalone projects or equipment not directly connected to the main stream power system such as Oil Containment, Fire Protection, Compressors, LVAC Supplies, Cable Cooling System, Batteries etc.) then formally defined alternative arrangements specified by the Commissioning Panel (which may include alternative commissioning authorisation arrangements) may be defined and utilised.

It is recognised that for investments that fall into the category of single asset replacement or refurbishment/recondition (as defined in UKBP/TP236) then the full application of this TP may not provide the most cost efficient means of delivering that investment and hence the TP minimum requirements as defined in UKBP/TP236 may be applied.

These minimum requirements are defined for each type of single asset replacement or refurbishment/recondition investment and are presented as separate appendices in UKBP/TP236. e.g. Appendix B, CB Replacement (with CTs) & (without CTs).

Amendments to this procedure shall be reflected in UKBP/TP236 Appendices (if required) and may result in the re-issue of UKBP/TP236.

e) Where there is more than one project being carried out at a single substation the following criteria shall be used to determine whether separate or combined Commissioning Panel(s) shall be held.

1. If the projects are completely separate and there are no commissioning interfaces, separate Commissioning Panels should be held, a combined UKBP_TP153 Coordination meeting should be held.

2. If the projects overlap, i.e. use of circuits/schemes one Commissioning Panel held with one being nominated as the lead project and providing the Chairman. The project manager/engineer of the other projects (not the lead) will retain responsibility for those aspects usually covered by the Chairman (i.e. signing part 1 of CCCC and the Commissioning Report for his own project). Each project will have its own appointed Commissioning Officer, each one shall attend the Commissioning Panel (in some instances these may be one of the same individual). A combined UKBP_TP153 meeting to be held.

3. In the event that there is more than one project at a substation with the design for these projects carried out by one party, a single Commissioning Panel shall be held with a Chairman and Commissioning Officer, having full responsibility for these projects. A combined UKBP_TP153 meeting will also be held.

f) Appendix A (Commissioning Panel Meeting Model Format) forms the executive part of this procedure. This appendix is the cornerstone of UKBP_TP106 and links to all other requirements defined in the document.

g) For simple or repetitive projects the Commissioning Panel may define an abridged version of Appendix A.

NB: In this procedure the term commissioning will usually be taken to include the requirements of commissioning, decommissioning and recommissioning.

Commissioning Objectives

To achieve satisfactory Equipment commissioning UKBP_TP106 targets five prime objectives.

a) Statutory (primarily Health & Safety, and Environmental)

b) Transmission System reliability (i.e. maintaining reliability during commissioning

c) Organisation (definition of tasks, responsibilities and timescales)

d) Performance tests (i.e. testing regime that ensures satisfactory equipment commissioning)

e) Contractual requirements

Commissioning Philosophy

To ensure that the National Grid System is commissioned to a standard which enables the objectives to be achieved, commissioning philosophy comprises:

a) Process framework – UKBP_TP106 – thereby ensuring that commissioning is carried out with a demonstrable level of governance and associated audit trail.

b) Requisite skills, knowledge and competency – UKBP_ TP141 – thereby ensuring the quality and accuracy of the commissioning undertaken.

See more

Also Bought By Customers

Also Bought By Customers…

 

Document History

  1. NG UKBP/TP 106

    You are currently viewing this product 👀 currently
    viewing

    April 2016
    UK Business Procedure/Transmission Procedures - Equipment Commissioning & Decommissioning

    • Most Recent  Most Recent
  2. NG UKBP/TP 106

    March 2015
    UK Business Procedure/Transmission Procedures - Equipment Commissioning & Decommissioning

    • Historical Version
  3. NG UKBP/TP 106

    April 2013
    UK Business Procedure/Transmission Procedures - Equipment Commissioning & Decommissioning

    • Historical Version
  4. NG UKBP/TP 106A

    June 2009
    UK Business Procedure/Transmission Procedures - Equipment Commissioning & Decommissioning

    • Historical Version

Order Options

Delivery Options
Price: $491.00
Available for Immediate Download

Product Details

Edition:

12

Published:

04/01/2016

Number of Pages:

127

File Size:

1 file

Note:

This product is restricted and cannot be purchased in these countries.
✕

Document Delivery Options

PDF
A Portable Document Format which is electronic and downloadable. All PDF's can be downloaded from your My Downloads page in your Accuris Store account. Refer to Help Center for more details.
Printed Edition
A vast majority of our standards are available in printed format. Sometimes these are bound like a book, sometimes loose pages that you can put in a binder.
✕

Document Set

This document is a set or collection of related documents
✕

Complete Document

The standards and other regulatory documents that Accuris offers are often updated after publication. These updates include errata (known issues to be addressed in the next version), corrigenda (errors or mistakes identified after publication), or amendments (additional information not included in the original document).

When you purchase a document from the Accuris store, you may select whether to buy only the base document or a complete document package that includes all errata, corrigenda, and amendments available for that document at the time of purchase. It does not grant access to errata, corrigenda, or amendments that may be published after the purchase date.
✕

Multi-User PDF

A Multi-User PDF allows you to purchase a finite set of single user licenses for a specific document. The number of user licenses available for purchase varies by document, please see the store listing for more specific information.
✕

Redline

When you purchase a Redline edition of a standard, you will get the current edition of that standard, plus the Redline version, which will show changes between the new edition and the previous edition.
✕

Member Price

Member pricing is available for this product.
✕

Restricted Countries

Belarus, Cuba, Iran, Nicaragua, North Korea, Russia, Sudan, Syria, Ukraine, Venezuela
✕

What is a Secured PDF?

Secured PDFs are equipped with Digital Rights Management (DRM) software, by request of the Publisher to protect the copyright of the Publication, preventing unauthorized duplication and distribution.

What does this mean?

To view the PDF, a DRM tool, FileOpen must be installed. FileOpen is a free plugin which is compatible with Adobe Acrobat Reader DC and Pro DC, as well as other PDF Readers noted on the FileOpen website.

What can you do with a Secured PDF?

  • Print (except for IADC, ICML)
  • Search
  • Highlight
  • Bookmark

Restrictions:

  • Some Publishers do not allow printing.
  • Most Publishers do not permit copy and pasting from the PDF.
  • Sharing, Duplicating and Distribution prohibited.
  • For further information on restrictions, please click here.

PRODUCTS & SERVICES

  1. BPVC 2025
  2. BPVC Previous Editions
  3. Engineering Workbench
  4. Track It

CUSTOMER CARE

  1. Help Center
  2. Glossary
  3. Search Tips

CONNECT WITH US

  1. Contact Us

COMPANY INFORMATION

  1. About Accuris
  2. Press
  • © Copyright 2026 ACCURIS
  • Privacy Policy
  • System Information
Device/OS: Unknown
Browser: Unknown Browser 0.0
User Agent: Mozilla/5.0 AppleWebKit/537.36 (KHTML, like Gecko; compatible; ClaudeBot/1.0; +claudebot@anthropic.com)
Store Name: css
Page: /standards/ng-ukbp-tp-106?product_id=2783287
Referrer: Direct Navigation
IP: 216.73.216.195
Language: en
Customer #: Not Logged In
Member?: NO
Cart #: 1464074958
Order #: None
Cookies: YES
×